All-in-One Report Demo (NSN: 1945012651123, Part Number: 2B047S311610003)
Master Cross Reference Data (MCRD) - alternate part numbers for national stock numbers
NSN Description MCRL Information
|
|
1945012651123
CAUSEWAY SECTION POWERED
INC: 77777
HMIC: N
ESDC:
ENAC:
Cancelled By: |
|
|
|
|
|
|
DRMS - Government Auction History - (NSN : 1945012651123)
|
|
Description
Event #
Lot #
|
Location |
Total Bid |
QTY #Items in Lot
|
Condition
Acquisition Price
|
Lot Title
|
|
CAUSEWAY SECTION PO
Event: 4914
Lot: 8911
|
Coronado CA |
Details Available
|
Qty: 1
Items: 1
|
F7
Details Available
|
SIDE LOADABLE WARPING TUG CONSIST OF A WATERJET PROPULSION ASSY SPEC NO 2B047-S3116-20-037; CONNECTED TO A PONTOON STRUCTURE COMPRISED OF 22 P1 PONTOONS, 6 P1-M, ONE P8-F, ONE P8-CPONTOON, AND 2 P11 PONTOONS; ALL IAW NAVFAC SPEC NO 2B047-S3116-30-012; NOM LG 90FT, 22FT W, NOM HT 13 FT AT CONTROL STATION, AND 53 AT HULL, 205, 000 LBS WEIGHT; WATERJET PROPULSION ASSEMBLY INCLUDES 1 PORT PROP MODULE, 1 STBD PROP MODULE, AND 1 CENTER MODULE; DRAWING NO 61380921, SPEC NO 2B047-S3116-10-003. FACILITY WILL PROVIDE SERVICE OF MOVING CAUSEWAY OUT OF WATER IF NEED BE. FACILITY EXPECTS REASONABLE TIME OF 2 DAYS TO CUT CAUSEWAY IF REMOVING BY LAND. FACILITY WILL TRY TO PROVIDE LOADOUT SERVICE DEPENDING ON AVAILABILITY OF ACB-1 LOADING EQUIPMENT AND PERSONNEL. IF CUTTING CAUSEWAY BASE REQUIRES FIRE DEPARTMENT PERMIT, AND TO BE CERTIFIED TO CUT.
|
|
|
CAUSEWAY SECTION PO
Event: 5093
Lot: 1
|
Coronado CA |
Details Available
|
Qty: 1
Items: 2
|
F7
Details Available
|
CAUSEWAY SECTION POWERED CONSIST OF A WATERJET PROPULSION ASSY SPEC NO 2B047-S3116-20-037; CONNECTED TO A PONTOON STRUCTURE COMPRISED OF 22 P1 PONTOONS, 6 P1-M, ONE P8-F, ONE P8-CPONTOON, AND 2 P11 PONTOONS; ALL IAW NAVFAC SPEC NO 2B047-S3116-30-012; NOM LG 90FT, 22FT W, NOM HT 13 FT AT CONTROL STATION, AND 53 AT HULL, 205, 000 LBS WEIGHT; WATERJET PROPULSION ASSEMBLY INCLUDES 1 PORT PROP MODULE, 1 STBD PROP MODULE, AND 1 CENTER MODULE; DRAWING NO 61380921, SPEC NO 2B047-S3116-10-003 FACILITY WILL PROVIDE SERVICE OF MOVING CAUSEWAY OUT OF WATER IF NEED BE. FACILITY EXPECTS REASONABLE TIME OF 2 DAYS TO CUT CAUSEWAY IF REMOVING BY LAND. FACILITY WILL TRY TO PROVIDE LOADOUT SERVICE DEPENDING ON AVAILABILITY OF ACB-1 LOADING EQUIPMENT AND PERSONNEL. IF CUTTING CAUSEWAY BASE REQUIRES FIRE DEPARTMENT PERMIT, AND TO BE CERTIFIED TO CUT. BIDDING IS ON ONE CAUSEWAY SECTION, THE REST OF THIS DESCRIPTION IS WHAT ONE CAUSEWAY IS COMPRISED OF.
|
|
|
CAUSEWAY SECTION PO
Event: 5093
Lot: 1
|
Coronado CA |
Details Available
|
Qty: 1
Items: 2
|
F7
Details Available
|
CAUSEWAY SECTION POWERED CONSIST OF A WATERJET PROPULSION ASSY SPEC NO 2B047-S3116-20-037; CONNECTED TO A PONTOON STRUCTURE COMPRISED OF 22 P1 PONTOONS, 6 P1-M, ONE P8-F, ONE P8-CPONTOON, AND 2 P11 PONTOONS; ALL IAW NAVFAC SPEC NO 2B047-S3116-30-012; NOM LG 90FT, 22FT W, NOM HT 13 FT AT CONTROL STATION, AND 53 AT HULL, 205, 000 LBS WEIGHT; WATERJET PROPULSION ASSEMBLY INCLUDES 1 PORT PROP MODULE, 1 STBD PROP MODULE, AND 1 CENTER MODULE; DRAWING NO 61380921, SPEC NO 2B047-S3116-10-003 FACILITY WILL PROVIDE SERVICE OF MOVING CAUSEWAY OUT OF WATER IF NEED BE. FACILITY EXPECTS REASONABLE TIME OF 2 DAYS TO CUT CAUSEWAY IF REMOVING BY LAND. FACILITY WILL TRY TO PROVIDE LOADOUT SERVICE DEPENDING ON AVAILABILITY OF ACB-1 LOADING EQUIPMENT AND PERSONNEL. IF CUTTING CAUSEWAY BASE REQUIRES FIRE DEPARTMENT PERMIT, AND TO BE CERTIFIED TO CUT. BIDDING IS ON ONE CAUSEWAY SECTION, THE REST OF THIS DESCRIPTION IS WHAT ONE CAUSEWAY IS COMPRISED OF.
|
|
|
CAUSEWAY SECTION PO
Event: 5094
Lot: 8910
|
Coronado CA |
Details Available
|
Qty: 1
Items: 2
|
F7
Details Available
|
CAUSEWAY SECTION POWERED CONSISTS OF A WATERJET PROPULSION ASSY SPEC NO 2B047-S3116-20-037; CONNECTED TO A PONTOON STRUCTURE COMPRISED OF 22 P1 PONTOONS, 6 P1-M, ONE P8-F, ONE P8-CPONTOON, AND 2 P11 PONTOONS; ALL IAW NAVFAC SPEC NO 2B047-S3116-30-012; NOM LG 90FT, 22FT W, NOM HT 13 FT AT CONTROL STATION, AND 53 AT HULL, 205, 000 LBS WEIGHT; WATERJET PROPULSION ASSEMBLY INCLUDES 1 PORT PROP MODULE, 1 STBD PROP MODULE, AND 1 CENTER MODULE; DRAWING NO 61380921, SPEC NO 2B047-S3116-10-003 FACILITY WILL PROVIDE SERVICE OF MOVING CAUSEWAY OUT OF WATER IF NEED BE. FACILITY EXPECTS REASONABLE TIME OF 2 DAYS TO CUT CAUSEWAY IF REMOVING BY LAND. FACILITY WILL TRY TO PROVIDE LOADOUT SERVICE DEPENDING ON AVAILABILITY OF ACB-1 LOADING EQUIPMENT AND PERSONNEL. IF CUTTING CAUSEWAY BASE REQUIRES FIRE DEPARTMENT PERMIT, AND TO BE CERTIFIED TO CUT. BIDDING IS ON ONE CAUSEWAY SECTION, THE REST OF THIS DESCRIPTION IS WHAT ONE CAUSEWAY IS COMPRISED OF.
|
|
|
CAUSEWAY SECTION PO
Event: 5094
Lot: 8910
|
Coronado CA |
Details Available
|
Qty: 1
Items: 2
|
F7
Details Available
|
CAUSEWAY SECTION POWERED CONSISTS OF A WATERJET PROPULSION ASSY SPEC NO 2B047-S3116-20-037; CONNECTED TO A PONTOON STRUCTURE COMPRISED OF 22 P1 PONTOONS, 6 P1-M, ONE P8-F, ONE P8-CPONTOON, AND 2 P11 PONTOONS; ALL IAW NAVFAC SPEC NO 2B047-S3116-30-012; NOM LG 90FT, 22FT W, NOM HT 13 FT AT CONTROL STATION, AND 53 AT HULL, 205, 000 LBS WEIGHT; WATERJET PROPULSION ASSEMBLY INCLUDES 1 PORT PROP MODULE, 1 STBD PROP MODULE, AND 1 CENTER MODULE; DRAWING NO 61380921, SPEC NO 2B047-S3116-10-003 FACILITY WILL PROVIDE SERVICE OF MOVING CAUSEWAY OUT OF WATER IF NEED BE. FACILITY EXPECTS REASONABLE TIME OF 2 DAYS TO CUT CAUSEWAY IF REMOVING BY LAND. FACILITY WILL TRY TO PROVIDE LOADOUT SERVICE DEPENDING ON AVAILABILITY OF ACB-1 LOADING EQUIPMENT AND PERSONNEL. IF CUTTING CAUSEWAY BASE REQUIRES FIRE DEPARTMENT PERMIT, AND TO BE CERTIFIED TO CUT. BIDDING IS ON ONE CAUSEWAY SECTION, THE REST OF THIS DESCRIPTION IS WHAT ONE CAUSEWAY IS COMPRISED OF.
|
|
|
CAUSEWAY SECTION PO
Event: 5155
Lot: 8913
|
Coronado CA |
Details Available
|
Qty: 1
Items: 3
|
F7
Details Available
|
Causeway Section Powered consists of a water jet propulsion assy spec no 2B047-S311-20-037; connected to a pontoon structure comprised of 22 P1 pontoons, 6 P1-M, One P8-F, One P8-C pontoon, and 2 P11 pontoons; all IAW navfac spec no 2B047-S3116-30-012; Nom lg 90ft, 22 ft w, nom ht 13 ft at control station and 53 at Hull, 205, 000lbs weight, water jet propulsion assembly includes 1 port prop module, 1 stbd prop module, and 1 center module, drawing no 61380921, spec no SPEC NO 2B047-S3116-10-003. S/ N: CSP-162. Powered Causeway is to be removed via water only. No cutting or mutilation allowed on site. Bidding is on one causeway section, the rest of this description is what one causeway comprised of.
|
|
|
CAUSEWAY SECTION PO
Event: 5155
Lot: 8914
|
Coronado CA |
Details Available
|
Qty: 1
Items: 2
|
F7
Details Available
|
Causeway Section Powered consists of a water jet propulsion assy spec no 2B047-S311-20-037; connected to a pontoon structure comprised of 22 P1 pontoons, 6 P1-M, One P8-F, One P8-C pontoon, and 2 P11 pontoons; all IAW navfac spec no 2B047-S3116-30-012; Nom lg 90ft, 22 ft w, nom ht 13 ft at control station and 53 at Hull, 205, 000lbs weight, water jet propulsion assembly includes 1 port prop module, 1 stbd prop module, and 1 center module, drawing no 61380921, spec no SPEC NO 2B047-S3116-10-003. S/ N: CSP-158. Powered Causeway is to be removed via water only. No cutting or mutilation allowed on site. Bidding is on one causeway section, the rest of this description is what one causeway comprised of.
|
|
|
CAUSEWAY SECTION PO
Event: 5155
Lot: 8910
|
Coronado CA |
Details Available
|
Qty: 1
Items: 2
|
F7
Details Available
|
Causeway Section Powered consists of a water jet propulsion assy spec no 2B047-S311-20-037; connected to a pontoon structure comprised of 22 P1 pontoons, 6 P1-M, One P8-F, One P8-C pontoon, and 2 P11 pontoons; all IAW navfac spec no 2B047-S3116-30-012; Nom lg 90ft, 22 ft w, nom ht 13 ft at control station and 53 at Hull, 205, 000lbs weight, water jet propulsion assembly includes 1 port prop module, 1 stbd prop module, and 1 center module, drawing no 61380921, spec no SPEC NO 2B047-S3116-10-003. S/ N: CSP-118. Powered Causeway is to be removed via water only. No cutting or mutilation allowed on site. Bidding is on one causeway section, the rest of this description is what one causeway comprised of. brightcove.createExperiences();
|
|
|
CAUSEWAY SECTION PO
Event: 5155
Lot: 8913
|
Coronado CA |
Details Available
|
Qty: 1
Items: 3
|
F7
Details Available
|
Causeway Section Powered consists of a water jet propulsion assy spec no 2B047-S311-20-037; connected to a pontoon structure comprised of 22 P1 pontoons, 6 P1-M, One P8-F, One P8-C pontoon, and 2 P11 pontoons; all IAW navfac spec no 2B047-S3116-30-012; Nom lg 90ft, 22 ft w, nom ht 13 ft at control station and 53 at Hull, 205, 000lbs weight, water jet propulsion assembly includes 1 port prop module, 1 stbd prop module, and 1 center module, drawing no 61380921, spec no SPEC NO 2B047-S3116-10-003. S/ N: CSP-162. Powered Causeway is to be removed via water only. No cutting or mutilation allowed on site. Bidding is on one causeway section, the rest of this description is what one causeway comprised of. brightcove.createExperiences();
|
|
|
CAUSEWAY SECTION PO
Event: 5155
Lot: 8913
|
Coronado CA |
Details Available
|
Qty: 1
Items: 3
|
F7
Details Available
|
Causeway Section Powered consists of a water jet propulsion assy spec no 2B047-S311-20-037; connected to a pontoon structure comprised of 22 P1 pontoons, 6 P1-M, One P8-F, One P8-C pontoon, and 2 P11 pontoons; all IAW navfac spec no 2B047-S3116-30-012; Nom lg 90ft, 22 ft w, nom ht 13 ft at control station and 53 at Hull, 205, 000lbs weight, water jet propulsion assembly includes 1 port prop module, 1 stbd prop module, and 1 center module, drawing no 61380921, spec no SPEC NO 2B047-S3116-10-003. S/ N: CSP-162. Causeway has watertight integrity issues in the two Water Propulsion Assembly rooms, i. e. water is leaking into the craft in both port and starboard impeller rooms. Powered Causeway is to be removed via water or land. Cutting into smaller sections is permitted if needed for removal. only. Bidding is on one causeway section, the rest of this description is what one causeway comprised of.
|
|
|
CAUSEWAY SECTION PO
Event: 5155
Lot: 8911
|
Coronado CA |
Details Available
|
Qty: 1
Items: 1
|
F7
Details Available
|
Causeway Section Powered consists of a water jet propulsion assy spec no 2B047-S311-20-037; connected to a pontoon structure comprised of 22 P1 pontoons, 6 P1-M, One P8-F, One P8-C pontoon, and 2 P11 pontoons; all IAW navfac spec no 2B047-S3116-30-012; Nom lg 90ft, 22 ft w, nom ht 13 ft at control station and 53 at Hull, 205, 000lbs weight, water jet propulsion assembly includes 1 port prop module, 1 stbd prop module, and 1 center module, drawing no 61380921, spec no SPEC NO 2B047-S3116-10-003. S/ N: CSP-157. Powered Causeway is to be removed via water only. No cutting or mutilation allowed on site. Bidding is on one causeway section, the rest of this description is what one causeway comprised of. brightcove.createExperiences();
|
|
|
CAUSEWAY SECTION PO
Event: 5155
Lot: 8912
|
Coronado CA |
Details Available
|
Qty: 1
Items: 1
|
F7
Details Available
|
Causeway Section Powered consists of a water jet propulsion assy spec no 2B047-S311-20-037; connected to a pontoon structure comprised of 22 P1 pontoons, 6 P1-M, One P8-F, One P8-C pontoon, and 2 P11 pontoons; all IAW navfac spec no 2B047-S3116-30-012; Nom lg 90ft, 22 ft w, nom ht 13 ft at control station and 53 at Hull, 205, 000lbs weight, water jet propulsion assembly includes 1 port prop module, 1 stbd prop module, and 1 center module, drawing no 61380921, spec no SPEC NO 2B047-S3116-10-003. S/ N: CSP-154. Powered Causeway is to be removed via water only. No cutting or mutilation allowed on site. Bidding is on one causeway section, the rest of this description is what one causeway comprised of. brightcove.createExperiences();
|
|
|
CAUSEWAY SECTION PO
Event: 5155
Lot: 8914
|
Coronado CA |
Details Available
|
Qty: 1
Items: 2
|
F7
Details Available
|
Causeway Section Powered consists of a water jet propulsion assy spec no 2B047-S311-20-037; connected to a pontoon structure comprised of 22 P1 pontoons, 6 P1-M, One P8-F, One P8-C pontoon, and 2 P11 pontoons; all IAW navfac spec no 2B047-S3116-30-012; Nom lg 90ft, 22 ft w, nom ht 13 ft at control station and 53 at Hull, 205, 000lbs weight, water jet propulsion assembly includes 1 port prop module, 1 stbd prop module, and 1 center module, drawing no 61380921, spec no SPEC NO 2B047-S3116-10-003. S/ N: CSP-158. Powered Causeway is to be removed via water only. No cutting or mutilation allowed on site. Bidding is on one causeway section, the rest of this description is what one causeway comprised of. brightcove.createExperiences();
|
|
|
CAUSEWAY SECTION PO
Event: 5155
Lot: 8910
|
Coronado CA |
Details Available
|
Qty: 1
Items: 2
|
F7
Details Available
|
Causeway Section Powered consists of a water jet propulsion assy spec no 2B047-S311-20-037; connected to a pontoon structure comprised of 22 P1 pontoons, 6 P1-M, One P8-F, One P8-C pontoon, and 2 P11 pontoons; all IAW navfac spec no 2B047-S3116-30-012; Nom lg 90ft, 22 ft w, nom ht 13 ft at control station and 53 at Hull, 205, 000lbs weight, water jet propulsion assembly includes 1 port prop module, 1 stbd prop module, and 1 center module, drawing no 61380921, spec no SPEC NO 2B047-S3116-10-003. S/ N: CSP-118. Powered Causeway is to be removed via water only. No cutting or mutilation allowed on site. Bidding is on one causeway section, the rest of this description is what one causeway comprised of.
|
|
|
CAUSEWAY SECTION PO
Event: 5342
Lot: 8910
|
Coronado CA |
Details Available
|
Qty: 1
Items: 1
|
F7
Details Available
|
Causeway Section Powered consists of a water jet propulsion assy spec no 2B047-S311-20-037; connected to a pontoon structure comprised of 22 P1 pontoons, 6 P1-M, One P8-F, One P8-C pontoon, and 2 P11 pontoons; all IAW navfac spec no 2B047-S3116-30-012; Nom lg 90ft, 22 ft w, nom ht 13 ft at control station and 53 at Hull, 205, 000lbs weight, water jet propulsion assembly includes 1 port prop module, 1 stbd prop module, and 1 center module, drawing no 61380921, spec no SPEC NO 2B047-S3116-10-003. S/ N: CSP-118. Powered Causeway is to be removed via water only. No cutting or mutilation allowed on site. Engines have sustained substantial water damage. Bidding is on one causeway section, the rest of this description is what one causeway comprised of.
|
|
|
CAUSEWAY SECTION PO
Event: 5444
Lot: 8914
|
Coronado CA |
Details Available
|
Qty: 1
Items: 1
|
F7
Details Available
|
Causeway Section Powered consists of a water jet propulsion assy spec no 2B047-S311-20-037; connected to a pontoon structure comprised of 22 P1 pontoons, 6 P1-M, One P8-F, One P8-C pontoon, and 2 P11 pontoons; all IAW navfac spec no 2B047-S3116-30-012; Nom lg 90ft, 22 ft w, nom ht 13 ft at control station and 53 at Hull, 205, 000lbs weight, water jet propulsion assembly includes 1 port prop module, 1 stbd prop module, and 1 center module, drawing no 61380921, spec no SPEC NO 2B047-S3116-10-003. S/ N: CSP-162. Powered Causeway is to be removed via water only. No cutting or mutilation allowed on site. Engines have sustained substantial water damage. Bidding is on one causeway section, the rest of this description is what one causeway comprised of.
|
|
|
|
|
|
Technical Characteristics - detailed information such as measurements and material type for national stock numbers
|
|
NSN
Item Name |
Technical Characteristics |
1945-012651123
CAUSEWAY SECTION POWERED |
|
|
|
|
|
Management Data - US Gov't supply management data (costs, storage, etc.)
|
|
NSN Item Name |
Management Data |
|
|
1945-012651123
CAUSEWAY SECTION POWERED
|
PMIC |
Criticality |
ADPE |
ESDC |
HMIC |
DEML |
A |
X |
|
|
N |
A |
S / A |
SOS |
AAC |
QUP |
UI |
Unit Price |
SLC |
CIIC |
Rep Code |
Mgmt Ctrl |
Phrase Data |
Details Available
|
|
|
|
|
|