LOT (1) TRI-WALL PLUMBING EQUIP TO INCLUDE: SHAFT SLEEVE PUMP, FAN VANEAXIAL, CLAMP HOSE, REDUCER TUBE, UNION PIPE, PLATE PORT PUMP, HEATING ELEMENT, AIR FILTER ELEMENT, RING PISTON, NIPPLE PIPE
LOT (2) TRI-WALL PLUMBING SUPPLY TO INCLUDE:CLAMP HOSE/ HOSE/ COMPRESSION/ BLOCK, JUNCTION/ TUBE ASSEMBLY/ TUBE, BEWT METALLIC/ HEATER, DUCT TAPE/ SLEEVE CYLINDER/ PLUG, CAP, TUBE/ ELBOW TUBE/ ELBOW PIPE/ HOSE ASSEMBLY, NON-METALLIC/ ADAPTER, STRAIGHT/ VALVE FLAPPER, PUMP/ POWER ELEMENT, PUMP/ HEATING ELEMENT (ALL QUANTITIES ARE APPRX AND BASED ON DRMO COUNTS) ITIES ARE APPRX AND BASED ON DRMO COUNTS)
Management Data - US Gov't supply management data (costs, storage, etc.)